Facility and tool readiness
On a new fab, the building, utilities and tools come from different contractors working to different plans. We bring them onto one schedule and check that each area is ready before tools arrive.
Sound familiar?
- Hook-up is waiting on the cleanroom.
- Utilities are late when tools move in.
- Every contractor reports green, but the programme keeps slipping.
What we do
- Map every dependency between facility, utilities and tools.
- Look ahead for dates at risk while there's still time to fix them.
- Agree what ready means at each gate and check it on site.
What you get
Interface register · Look-ahead plan · Readiness checks at each gate
What we'd measure
Move-in dates held · Rework at move-in
Advisors in this area
Where we'd start
A readiness review of one module or area.
Tell us which module and which step worries you most. If you want us to see the schedule, we'll sign a mutual NDA first.